Skip to main content

Inverness Water and Sanitation District Fees and Charges Commercial Tap & Development Fees

Monthly Service Fees:

(Effective May 1, 2020)

Water Service Fees: 

  • $35.00 minimum monthly fee
  • $4.86 per 1,000 gallons within annual allocation
  • $9.72 per 1,000 gallons in excess of annual allocation
  • $14.58 per 1,000 gallons in excess of 150% of annual allocation
  • $8.51 per 1,000 gallons for Industrial and Construction water users

Sewer Service Fees.

  • $25.00 minimum monthly fee
  • $7.73 per 1,000 gallons of domestic water use based on monthly metered use.

Tap Fees:

Tap fees are a one-time system development and connection fee consisting of the following: 

  1. Development Fee. $3,000 per acre to be served
  2. Water Taps (Domestic and Irrigation)
  3. Sewer Taps
  4. Drainage Detention Storage Permit. $150.00 per 1,000 square feet of impermeable site area unless on site detention is provided.
  5. Plan Review/Inspection Fees.
  6. Installation Fees
  7. Regional Stormwater Quality Treatment Permit. $1,200 per acre.

Water and Sewer Tap Fees

 Water Meter Size Water Tap FeeSewer Tap Fee
 3/4" $14,880$6,600
 1" $32,040$13,200
 1 1/2" $53,690$28,600
 2" $85,930$57,200
 3" $129,000$99,000
 4" $206,000$165,000
 6" $413,200$396,000

 Installation Fees

 Service Cost
 Water Tap Installation $300.00
 Sewer Tap Installation $300.00
 Fire Line Installation $300.00
 Irrigation Installation $300.00

Residential Tap & Development Fees:

$9,174 per unit, which includes water, sewer, drainage, detention, stormwater quality, and reviews.

Download Water and Sanitation Rates (pdf)