Inverness Water and Sanitation District Fees and Charges Commercial Tap & Development Fees
Monthly Service Fees:
(Effective May 1, 2020)
Water Service Fees:
- $35.00 minimum monthly fee
- $4.86 per 1,000 gallons within annual allocation
- $9.72 per 1,000 gallons in excess of annual allocation
- $14.58 per 1,000 gallons in excess of 150% of annual allocation
- $8.51 per 1,000 gallons for Industrial and Construction water users
Sewer Service Fees.
- $25.00 minimum monthly fee
- $7.73 per 1,000 gallons of domestic water use based on monthly metered use.
Tap Fees:
Tap fees are a one-time system development and connection fee consisting of the following:
- Development Fee. $3,000 per acre to be served
- Water Taps (Domestic and Irrigation)
- Sewer Taps
- Drainage Detention Storage Permit. $150.00 per 1,000 square feet of impermeable site area unless on site detention is provided.
- Plan Review/Inspection Fees.
- Installation Fees
- Regional Stormwater Quality Treatment Permit. $1,200 per acre.
Water and Sewer Tap Fees
Water Meter Size | Water Tap Fee | Sewer Tap Fee |
---|---|---|
3/4" | $14,880 | $6,600 |
1" | $32,040 | $13,200 |
1 1/2" | $53,690 | $28,600 |
2" | $85,930 | $57,200 |
3" | $129,000 | $99,000 |
4" | $206,000 | $165,000 |
6" | $413,200 | $396,000 |
Installation Fees
Service | Cost |
---|---|
Water Tap Installation | $300.00 |
Sewer Tap Installation | $300.00 |
Fire Line Installation | $300.00 |
Irrigation Installation | $300.00 |
Residential Tap & Development Fees:
$9,174 per unit, which includes water, sewer, drainage, detention, stormwater quality, and reviews.